At PROMAC Consulting, our dedicated Construction Scheduling Team plays a vital role in ensuring every project is delivered on time and with precision. With expertise in Primavera P6, project controls, and schedule risk management, our team supports contractors, owners, and stakeholders by developing reliable schedules, monitoring progress, and providing clear insights for informed decision-making.

Tahir Khattak, PE, PMP, PMI-SP, PMI-RMP
Project Controls Director | Founder, Promac Consulting
PROFESSIONAL QUALIFICATION:
Tahir Khattak is a licensed Professional Engineer and certified Project Management Professional with more than 17 years of multidisciplinary experience delivering complex infrastructure programs in the transportation, water, defense, education, and building sectors.
He specializes in project controls, scheduling, cost and risk management, delay analysis, and forensic schedule review, providing clients with data-driven, compliance-focused insights throughout the project life cycle. Tahir has successfully supported federal, state, and local agencies—including the U.S. Department of Veterans Affairs (VA), Naval Facilities Engineering Systems Command (NAVFAC), and the U.S. Army Corps of Engineers (USACE)—on projects requiring rigorous documentation, schedule analysis, and audit-ready reporting.
Proficient in Primavera P6, MS Project, E-Builder, AutoCAD, and the Microsoft Office Suite, Tahir delivers value through all phases of project delivery—from planning and baseline development to execution, closeout, and claims resolution.
EDUCATION:
MSc, Civil & Infrastructure Engineering, George Mason University, Fairfax, VA – 2017
BSc, Civil Engineering, NUST, Islamabad – 2008
CERTIFICATIONS:
Project Management Professional (PMP) – VA, 2015, PMI Scheduling Professional (PMI-SP) – VA, 2016, PMI Risk Management Professional (PMI-RMP) – VA, 2023, Dispute Resolution Board Administration & Practice/Chairing – DRB Foundation, Management Essentials – Harvard Business School, Contract Law & Construction Delay Claim – FPS, RSMeans Cost Estimating – Gordian, Forensic Schedule Delay Analysis – Project Control Academy
PROJECTS EXPERIENCE
Federal & Defense Sector (NAVFAC / USACE / VA/ DoD)
Tahir’s experience includes serving with Contract Watts, Inc. as a Project Controls Specialist, providing scheduling and cost-control support on multiple NAVFAC and USACE projects involving facilities modernization, infrastructure renewal, and base-wide utility improvements.
Currently, through Promac Consulting, Tahir is leading baseline development, monthly schedule updates, and independent schedule reviews for several ongoing projects with the U.S. Department of Veterans Affairs, Naval Facilities Engineering Systems Command, and the U.S. Army Corps of Engineers.
Transit & Rail Programs (FTA Oversight & Risk Management)
Tahir has provided scheduling, risk, and program-controls leadership for several of the nation’s largest federally funded transit capital programs:
Silicon Valley Phase II Extension – $12.3B, BART Transbay Corridor Core Capacity – $2.7B, Transbay Downtown Rail Extension – $8.3B, Caltrain Peninsula Corridor Electrification – $1.9B, HART High-Capacity Transit Corridor – $9B, Richmond Highway BRT – $730M
These assignments involved Monte Carlo schedule-risk modeling, quantitative/qualitative risk workshops, and FTA readiness assessments, showcasing Tahir’s mastery of large-scale program oversight.
Education Facilities
Kennedy High School Comprehensive Modernization – $180M
Huntington Park High School Modernization – $105M
McKinley Elementary School – $80M
Delivered fully cost- and resource-loaded baselines, monthly progress updates, and time-impact analyses for multi-phase K–12 modernization programs.
Transportation / Bridges / Roadways
South Capitol Street Corridor & Frederick Douglass Memorial Bridge Replacement – $440M
Provided schedule and risk management services for one of the most technically complex bridge replacement projects in the Washington, D.C. region.
Water / Wastewater
Potomac Water Supply Program – Trap Rock Water Treatment Facility – $400M
Developed and maintained master construction schedules, implemented earned-value tracking, and analyzed contractor delay claims.
Power / Energy / Industrial
Jinnah Hydropower Project (96 MW) – $160M
380 kV Transmission Line Construction – $73M
Supported EPC contractors with cost-loaded scheduling, earned value reporting, and integrated controls.
International Commercial & Infrastructure
Experience across Bahrain and Saudi Arabia includes LAMAR Tower, CMA Headquarters, Haram Expansion, Ras Al Zawr Power & Desalination Plant, and the Four Seasons Hotel Bahrain—demonstrating versatility in delivering large-scale vertical, utility, and industrial projects.
Experience Summary
- Years of Experience: 17
- Sectors Served: Transportation • Transit & Rail • Defense • Education • Water/Wastewater • Energy • Public Buildings • International Infrastructure