The $ 180 million project includes demolitions, new construction, and renovations. The Project encompasses most of the Kennedy HS campus and consists of the comprehensive modernization of the campus, including demolition, construction, and renovation activities. The Project includes the demolition and removal of 22 relocatable buildings (containing 30 classrooms) and the construction of a new 2O,5O0-square-foot building (that will provide ten new classrooms). Additionally, the following buildings would be renovated to improve seismic safety: 1) Classroom Buildings #1, #2, and #3; 2) the Library Building; 3) the Science Building; 4) the Student Store Building; 5) the Cafeteria Building; 6) the Oral Arts Building; 7) the Music Building; 8) the Shop Building; and 9) the Adult School Office. Other improvements include campus-wide infrastructure, including domestic water, fire, irrigation, gas, sewer, low voltage (e.g., fire, telephone, data), electrical and storm drainage, Americans with Disabilities Act (ADA) compliance, landscape, hardscape, interior and exterior paint, and window treatments. The Project scope also includes the placement of interim facilities, as necessary and subject to all relevant codes and regulations, to replace facilities and associated functions lost during construction.
We provided the Baseline Schedule for this Complex and Critical Project including Cost and Resource loading.
The $ 110 million project includes demolitions, new construction, and renovations of historically significant buildings. The Los Angeles Unified School District is the 2nd largest public school district in the United States, with over 1,000 schools serving over 600,000 students. Situated five miles south of Downtown LA, Huntington Park High School was chosen for substantial renovations by the district. Many of the campus buildings are from the 50s, 60s, and 70s with some dating as far back as 1923. The purpose of the project is to address critical facility issues, maximize student safety and ensure the entire campus provides a healthy environment conducive to learning.
Our team offers schedule management services that include providing monthly updates on the project schedule, as well as reports on the cost and resource-loaded schedule.
The $ 70 million project includes demolitions, new construction, and renovations. Modernization of existing campus to include 3 new buildings remodel of existing two buildings, and removal from site of all portable classrooms.
The proposed Comprehensive Modernization Project (Project) includes removing existing buildings with structural deficiencies that require cost-prohibitive seismic retrofit, removing existing relocatable buildings and storage containers, constructing new permanent buildings that provide adequate learning spaces and support areas, upgrading and replacing aging infrastructure, constructing new outdoor physical education spaces, and providing new landscaping and hardscaping. The proposed Project also consists of limited modernization of existing structures including limited barrier removal upgrades, Internet Protocol (IP) Convergence, exterior painting and limited interior improvements.
We specialize in providing Delay Claim preparation, Claim Cost estimation, and comprehensive support to RBT on multiple projects. Our expertise lies in understanding the intricacies of Delay analysis, the complex nature of projects, and the various contracting terms involved.
Having a deep understanding of Delay analysis allows us to accurately assess the impact of project delays, identify the causes, and develop robust claims. We recognize that projects can be multifaceted, involving numerous stakeholders and contractual obligations. Our knowledge and experience in navigating these complexities are instrumental in achieving successful resolutions when it comes to change orders.
We are committed to delivering meticulous analysis and support, ensuring that RBT is equipped with the necessary tools and expertise to effectively address and resolve claims. Our aim is to optimize outcomes, minimize disputes, and contribute to the overall success of RBT's projects.
We conducted a comprehensive review of the Delay Claim Report and Project Documents, offering expert opinions on the KMA/MTE Claim. Employing AACE International Recommended Practices, we performed a meticulous Forensic Schedule Analysis. Our analysis, which included concurrent delays, excusable delays, and compensable delays, was presented in a detailed position paper with supporting documentation.